Project Engineer
- Start
- 30 november 2026
- Looptijd
- 11 maanden
- Reageren tot
- 12 november 2026
- Opdrachtgever
- Vattenfall AB
- Gezien bij de bron
- vandaag 15:33
Kies je bemiddelaar
Vertage (Striive)
Detachering| Tarief van het bureau | onbekend |
| Fee | €2,69 per uur, gaat van het tarief af (Striive-tiers: Career € 2,69, Career plus € 3,49, Premium Career € 4,39 per gewerkt uur (actieprijzen)) |
| Reageren tot | open tot 12 nov |
| Transparantie |
Omschrijving
Project Engineer
Duties:
This role willl be both for Zeevonk project and for DK projects.
Vattenfall and Copenhagen Infrastructure Partners (CIP) are spearheading the development of ‘Zeevonk’. This innovative project merges a 2 GW offshore wind farm with an extensive floating solar park. A substantial portion of the generated electricity will be transformed into green hydrogen. The distinctive blend of offshore wind, solar energy, and green hydrogen at this scale makes Zeevonk unparalleled globally. Through this initiative, we are making a significant contribution towards achieving a carbon-free Dutch industry and society.
The Hesselø offshore wind project is located in the Kattegat Sea between Denmark and Sweden, around 30 km from the coast, with a minimum installed capacity of 800 MW. The North Sea I Mid Offshore Wind Project is located in the North Sea, approximately 20 km off the coast near Hvide Sande, with a minimum capacity of 1,000 MW.
Both projects will mark a significant contribution to Denmark’s fossil-free energy production. Grid connection has been reserved for both projects, with the connection point located approximately 50 km inland. The consent will be granted for 30 years, with an option to extend it by a further 10 years.
What you will do:
Engage with Supplier and Contractors with focus on T&I solutions
Provide guidelines to projects how to execute
Give T&I input to consenting
Proactively seeking solutions for new methodologies and products
Prepare and improve SDA assessments
Interface with installation vessel suppliers
Interface with installation tool suppliers
Develop T&I methodology (Performance, SDA, Installation Schedule, Risk) for all packages (WTG, FOU, IAC, EC, OSS)
Focus on innovation
Provide input to FEPM and all BCs for CAPEX calculation
Keeping and develop cost models and keeping them up to data
Developing and maintaining T&I BB
Skills:
Minimum 15 years of experiance in Cable Installation campaigns.
Capability of taking technical ownership on behalf of Vattenfall during offshore execution
Experience in coordination of technical interfaces between installation, engineering, HSE, marine operations and other project packages to ensure offshore activities are fully aligned and ready for execution.
Resilience in work with contractors, vessel teams and technical specialists, including the review of RAMS, installation procedures, vessel and equipment readiness, and lessons learned.
Proven track in managing the interfaces with the Transmission System Operator (TSO), ensuring clear communication, alignment of requirements and timely resolution of interfaces to enable the installation contractor to execute its offshore scope.
Experience in planning and execution of offshore installation activities, translating engineering concepts into safe, practical, and efficient offshore operations.
Education:
Preferably Engineering degree